Maintenance ProjectsFixed Price Operational Project

Fixed Price Operational Project

The Fixed Price Operational Project scope called for the refurbishment of a Dual Apron Feeder along with the refurbishment of all the running modules on the Dual Car Dumper. This project was carried out at Rio Tinto’s Dampier Operations.

These works were completed together in conjunction, utilising the one available overhead crane in the car dumper structure. Execution of these scopes were time critical as the removal of the availability to offload iron ore from trains created business exposure for our client, placing an emphasis of turnaround efficiency and minimising downtime.

View the detailed Scope of Works from this project by clicking the DOWNLOAD CASE STUDY button.