Project Duration: Five days.

Job Scope

Linkforce were contracted to undertake a series of projects within the primary area of OHP1, at Area C.

Overall the project was broken up into five main areas as below:

  1. Design and fabricate custom sleigh to house winch for pulling and replacing apron feeder belt. This was fabricated offsite but installed during the shutdown.

  2. Remove and replace apron feeder

  3. Jaw crusher reline and jaw crusher feed chute structural repairs

  4. Grizzly underflow rebu...

Please reload

Case Studies
Please reload

Search By Tags
Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

OUR CAREERS

JOIN THE TEAM

View the latest career opportunities available and register for job notifications.

CONTACT US

Head Office

ADDRESS

Ground Floor, 2 Victoria Avenue, PERTH WA 6000

POSTAL ADDRESS

Po Box 1845, Subiaco WA 6904

    EC11966

  • Facebook - Black Circle
  • LinkedIn - Black Circle
  • Twitter - Black Circle
Inquiries

PHONE

(08) 9287 0800

FAX

(08) 9287 0801

EMERGENCY CONTACT ONLY

(08) 9287 0805

EMAIL

reception@linkforce.com.au

© 2020 Linkforce.