Project Duration: 34 days

 

Scope and associated challenges

 

The project scope was to install a Biomax Waste Water Treatment Plant (WWTP) to service the administration and workshop areas at the Regional Mine Site – Mesa J located a few kilometres from the small town of Panawonica in the Pilbara.

 

The previous WWTP was too small to meet demand, had failed to function correctly and had been replaced by a temporary system of storage tanks which needed frequent emptying. This system was far from ideal and an upgrade was long overdue.
The challenges facing our team were:

 

Achieving completion within a reasonably tight timeframe whilst working in a remote location making deliveries of parts and materials at times difficult.

 

Excavating a rectangular hole approximately 15 Metres X 7 Metres, (including benches) 3.6 Metres deep on sloping ground with a steep bank close to the main Stores yard on one side and a sharp drop on another side leading to an evaporation pond.

 

Diverting existing sewage pipe to new system and ensuring excavation was to correct depth to allow adequate fall.


Crane issues due to uneven terrain and less than ideal access to lift areas.

Constructing a fence following undulating changes in elevation to form a perimeter of approximately 620 Metres including several gates.

 

Solutions and key points

 

The project was completed in good time and to the clients satisfaction due to careful and ongoing planning as the job progressed. We had all necessary machinery, equipment, tools, parts and materials on site with only minimal delays encountered.

 

Forward thinking and anticipation of potential future problems played a large part in the day to day progress of the project and lack of down time throughout the job.

 

Having a team of competent, conscientious individuals played an integral part in the successful completion of the project.

 

All Linkforce personnel involved with the project were extremely hard working and diligent in their duties. Attention to detail and an eye for accuracy were crucial to the overall quality of the project and all team members excelled in these areas.

The job was completed without incident and a good, professional working relationship with the Regional Mine Site staff was maintained at all times.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Share on Facebook
Share on Twitter
Please reload

Case Studies
Please reload

Search By Tags
Please reload

Follow Us
  • Facebook - Black Circle
  • Google+ - Black Circle
  • LinkedIn - Black Circle
  • Twitter - Black Circle

OUR CAREERS

JOIN THE TEAM

View the latest career opportunities available and register for job notifications.

CONTACT US

Head Office

ADDRESS

Ground Floor, 2 Victoria Avenue, PERTH WA 6000

POSTAL ADDRESS

Po Box 1845, Subiaco WA 6904

    EC11966

  • Facebook - Black Circle
  • LinkedIn - Black Circle
  • Twitter - Black Circle
Inquiries

PHONE

(08) 9287 0800

FAX

(08) 9287 0801

EMERGENCY CONTACT ONLY

(08) 9287 0805

EMAIL

reception@linkforce.com.au

© 2019 Linkforce.