YANDICOOGINA SUSTAINING PROJECT – INFRASTRUCTURE UPGRADE

The Yandi Sustaining Project was a significant design and construct contract completed over 24 months across multiple work fronts within the Rio Tinto Yandicoogina Mine Lease.

This is to date, the largest project undertaken by the Linkforce Projects Team. The Linkforce offsite and onsite work force faced and overcame numerous challenges with this contract including:

  • The construction of a temporary kitchen and dining facility for the construction workforce while the existing kitchen/dining facilities was upgraded to a high standard.

  • Client priority and scope changes impacted on design efficiencies.

  • Limits on available accommodation for the construction workforce.

  • Noise curfews working around the operations camp.

At the height of construction, Linkforce’s work force peaked at 100 personnel across a variety of trades and whom completed approximately 300,000 man-hours for the project.

 

 

 

Case Study

Share on Facebook
Share on Twitter
Please reload

Case Studies
Please reload

Search By Tags
Please reload

Follow Us
  • Facebook - Black Circle
  • Google+ - Black Circle
  • LinkedIn - Black Circle
  • Twitter - Black Circle

OUR CAREERS

JOIN THE TEAM

View the latest career opportunities available and register for job notifications.

CONTACT US

Head Office

ADDRESS

Ground Floor, 2 Victoria Avenue, PERTH WA 6000

POSTAL ADDRESS

Po Box 1845, Subiaco WA 6904

    EC11966

  • Facebook - Black Circle
  • LinkedIn - Black Circle
  • Twitter - Black Circle
Inquiries

PHONE

(08) 9287 0800

FAX

(08) 9287 0801

EMERGENCY CONTACT ONLY

(08) 9287 0805

EMAIL

reception@linkforce.com.au

© 2019 Linkforce.