Mount Morgan Pond Liner Replacement
Updated: Jul 30

Client Genesis Minerals

Service Shutdown & Maintenance

Location Western Australia

Market
Mining & Industrial

Commodity Gold
Overview
To address significant seepage issues caused by a deteriorated pond liner, Linkforce delivered the replacement of a critical containment pond at Genesis Minerals' Mount Morgan operation. What began as a repair assessment evolved into a full liner replacement after inspection identified extensive deterioration. Despite challenging groundwater conditions and severe weather impacts, Linkforce delivered a durable, compliant solution that restored the long-term integrity of the asset.

Service Delivery Area
Pipeline Construction
Civil Construction
Value Added
Experienced HDPE team with expertise in containment system inspections, repairs and replacements
Proactive assessment that identified a more effective long-term solution for the client
Agile response to challenging groundwater conditions and significant weather-related disruptions
Innovative remediation approach, including pond base stabilisation with a 300mm layer of cracker dust
Zero Lost Time Injuries (LTIs) achieved throughout project delivery
Certified management systems aligned with ISO 9001, ISO 14001 and ISO 45001 standards
Outcome
Linkforce successfully removed and replaced the existing pond liner, completed pond structure repairs, installed new bidem and liner materials to AS/NZ standards, and reinstated site infrastructure. Through effective management of groundwater ingress, sludge contamination and heavy rainfall events, the project was completed to a high standard, delivering a reliable containment solution and restoring the pond's operational performance.