Linkforce Awarded Further 5-Year Agreement with Rio Tinto
Linkforce has continued its long-standing partnership with Rio Tinto by securing a further 5-year Master Supply Agreement for Fixed Plant Shutdown Maintenance and Access Services, extending through to 2031 and valued at circa $800 million. The agreement continues our delivery of fixed plant maintenance across Western Australia’s iron ore operations and secures a strong pipeline of work across the Pilbara. Supported by nearly two decades of proven performance, the contract bui


Linkforce Awarded Major Conveyor and Electrical Infrastructure Package at Rio Tinto’s Cape Lambert Operations
Linkforce has been awarded a key package of work within Rio Tinto’s Cape Lambert A High Density Ore (CLAHDO) Project, strengthening our involvement in one of Western Australia’s most significant iron ore hubs. This award reflects Rio Tinto’s confidence in our technical capability and our proven performance across complex project scopes and large-scale construction programs. The Conveyor and Electrical Infrastructure Upgrades Package encompasses extensive electrical upgrades


Brockman 4 Rockbreaker Upgrades
Linkforce completed essential upgrades to the rock breaking infrastructure at Rio Tinto’s Brockman Syncline 4, addressing downtime and safety risks impacting production. The project included replacing four rock breakers and delivering structural, electrical, and control system enhancements to support remote operation. Completed in both online and offline environments, the works were delivered with minimal disruption, improving safety, efficiency, and long-term performance. O


Yandicoogina Truss Replacement Works
Linkforce successfully delivered a critical truss replacement for the YCV213 conveyor at Rio Tinto’s Yandicoogina mine. As a key component in the ore handling system, the conveyor required structural upgrades to support increased capacity and resolve long-standing integrity issues. Custom-engineered trusses were fabricated and installed to withstand complex operational and environmental loads. Drawing on a wide range of Linkforce’s in-house capabilities, the project was compl


Paraburdoo Cone Crusher Upgrades
Linkforce was engaged to upgrade aging Cone Crushers at Rio Tinto’s Paraburdoo mine, replacing two Secondary and four Tertiary Crushers that had exceeded their design life. The project addressed critical reliability, safety, and maintenance issues while the plant remained operational. Delivered on time and within budget, the upgrade significantly improved the long-term performance and safety of the crushing infrastructure. Overview Linkforce was engaged to deliver critical up


Contract Summary - Rio Tinto
Linkforce has been delivering Fixed Plant Maintenance services to RTIO’s Pilbara operations since May 2007. Our successful infield...


Contract Summary - Roy Hill Holdings
Linkforce has been delivering maintenance and shutdown services since early 2018 at Roy Hill’s Pilbara mining operations. Linkforce has...


Contract Summary - Newmont General Maintenance
Linkforce has been delivering maintenance services to Newmont since 2016. Our successful infield operations resulted in us being rewarded...


Contract Summary - FMG Maintenance
Linkforce has been delivering Fixed Plant Maintenance services to FMG’s Pilbara operations since December 2011. Our successful infield...


Contract Summary - BHP MSA
Linkforce has been delivering specialized mechanical, electrical and access services to BHP’s Western Australian Iron Ore fixed plant...


TLO Bin Replacement
RTIO West Angeles The Challenge Due to excessive corrosion of structural members, the upper section of the TLO Bin at West Angelas...


Apron Feeder Change Out Project
FMG Cloudbreak Value Added Linkforce developed an innovative method for these works that reduced onsite risk, improved safety...


Western Conveyor Crushing Facility Hopper No#8 Installation
FMG Cloudbreak Value Added The scope of this structural, mechanical and piping (SMP) / electrical and instrumentation (E&I) installation...


CV006 Overland Conveyor
FMG Cloudbreak Value Added 1500 tonnes of steel fabrication by Linkforce for this works. Installation of idler frames to a tolerance of...


TLO Bin Replacement Project
FMG Christmas Creek Value Added Achieving zero harm to personnel and the environment. Execution of works through the development and...


YTK211 Tank Upgrade
RTIO Yandicoogina Value Added The conclusion of the project saw the water tank commissioned with zero injuries to personnel and zero...


Rail Welding Yard Upgrade
FMG Eliwana Value Added In addition to creating an innovative working at heights solution for this package, this project marked the first...


Primary Crushing Building Structural Improvements
Rio Tinto Sustaining Capital Marandoo Value Added This project was successfully completed with zero injuries and zero incidents across...


Marradong & Saddleback LTE Program
South 32 - Worsley Alumina Project Value Added Linkforce delivered a superior technical solution on this project by creating a concept...


Wet Front End Change Out Project
FMG Cloudbreak The Challenge The scope of this project encompassed changing out the screen and chute assets in the Cloudbreak plant which...