linkforceAug 26, 20211 minTLO Bin ReplacementRTIO West Angeles The Challenge Due to excessive corrosion of structural members, the upper section of the TLO Bin at West Angelas...
linkforceAug 26, 20211 minApron Feeder Change Out ProjectFMG Cloudbreak Value Added Linkforce developed an innovative method for these works that reduced onsite risk, improved safety...
linkforceAug 26, 20211 minWestern Conveyor Crushing Facility Hopper No#8 InstallationFMG Cloudbreak Value Added The scope of this structural, mechanical and piping (SMP) / electrical and instrumentation (E&I) installation...
linkforceAug 26, 20211 minCV006 Overland ConveyorFMG Cloudbreak Value Added 1500 tonnes of steel fabrication by Linkforce for this works. Installation of idler frames to a tolerance of...
linkforceAug 26, 20211 minTLO Bin Replacement ProjectFMG Christmas Creek Value Added Achieving zero harm to personnel and the environment. Execution of works through the development and...
linkforceAug 26, 20212 minYTK211 Tank UpgradeRTIO Yandicoogina Value Added The conclusion of the project saw the water tank commissioned with zero injuries to personnel and zero...
linkforceAug 26, 20211 minRail Welding Yard UpgradeFMG Eliwana Value Added In addition to creating an innovative working at heights solution for this package, this project marked the first...
linkforceAug 26, 20211 minPrimary Crushing Building Structural ImprovementsRio Tinto Sustaining Capital Marandoo Value Added This project was successfully completed with zero injuries and zero incidents across...
linkforceAug 26, 20212 minMarradong & Saddleback LTE ProgramSouth 32 - Worsley Alumina Project Value Added Linkforce delivered a superior technical solution on this project by creating a concept...
linkforceAug 26, 20211 minWet Front End Change Out ProjectFMG Cloudbreak The Challenge The scope of this project encompassed changing out the screen and chute assets in the Cloudbreak plant which...
linkforceAug 26, 20211 minTrommel and Chute Replacement ProjectFMG Christmas Creek The Challenge Linkforce were engaged to remove and replace the trommels and discharge chutes on OPF 1 which had...
linkforceAug 26, 20212 minCar Dumper No#4 FestoonBHP Port Hedland Client: BHP Duration: 120HR shutdown Value Added Partnering with our client from the initial scoping engagement allowing...
linkforceAug 26, 20211 minJSE Wet Screen Change OutRTIO Yandicoogina Value Added Project was executed with the utilisation of Linkforce’s ‘Project Tracker Software’ providing the client...